When you post payable transactions to the Expense range of accounts, Sage 100 Contractor displays the Job Cost Distribution window.
To enter job costs:
In the Job box, enter the job number.
In the Phase box, enter the phase number.
In the Date box, enter the transaction date.
In the Description box, enter a brief statement about the job cost.
In the Transaction# box, enter the transaction number.
In the Cost Code box, enter the cost code number using the lookup window, then press Enter.
In the Cost Type box, select the cost type.
Repeat steps 1–7 for each item for which you want to create a cost record.
On the File menu, click Save.
Tips: