Preparing the next unitary bill
After submitting an application, you can prepare the next application. Sage 100 Contractor will assign the current application status 4-Closed, move the costs from the Current Qty column to the Previous Qty column, and advance the number in the Application# text box.
To prepare the next unitary bill:
- Open 3-9 Unitary Billing.
- Using the data control, select the last application for the job and phase.
- On the Options menu, click Create Next Application.