Entering overhead and profit rates for bid items
Note: This functionality is available only if you have the Estimating Module.
Note: Sage 100 Contractor updates all bid items in the takeoff with the indicated rates.
To enter overhead and profit rates for bid items:
- Open a takeoff in 9-5 Takeoffs.
- Next to the Bid Item list, click the detail button.
- In the Overhead column, enter the overhead rate for each cost type.
- In the Profit column, enter the profit rate for each cost type.
- Click Save.